Power Tower Company

Our Projects

Through our +20 years of experience, Power Tower Company has been able to deliver excellence in the electrical, water, gas and telecommunications industries with no hesitation to support 13 provinces in the Kingdom of Saudi Arabia.

Construction of new 132 kv DC OHTL from New Al Hayar S/S 8281 up to BSP S/S #9048 in Riyadh area
Year: 2025
RTV coating for insulators in western sector.
Year: 2023
Replacement of composite strings at OHTL 380 kv RBG2-JN.
Year: 2023
Tower Foundation Rehabilitation and Protection for OHTL WOA.
Year: 2023
Construction of new 132 kv DC OHTL from looping point up to new Khark Housing Project in Al Kharj area.
Year: 2022
Installation of line surge arresters at 110 kv OHTL MSR-HDA2-ARF.
Year: 2022
RTV Silicon coating on insulators for 380 & 132kv OHTL within 50 km SOA.
Year: 2022
Grounding of OHTL towers in WOA.
Year: 2021
Maintenance of 390kv OHTL in COA.
Year: 2021
Maintenance of 390kv OHTL in WOA.
Year: 2021
Reconductoring of MISQI-KKUC 132kv OHTL.
Year: 2021
Adjustment of vertical clearance for 132kv transmission lines in SOA. 
Year: 2021
Al Mansour HV oil cable 110kv UGC diversion in Makkah.
Year: 2021
Abdullah Uraif 110KV UGCV Diversion in Makkah.
Year: 2021
Permanent Diversion of the High Voltage cables 110KV at Jurhum Road
General maintenance of OHTL in WOA.
Year: 2020
Grounding of OHTL in western region.
Year: 2020
General Maintenance for OHTL in central operating area.
Year: 2018
Construction of 380kV OHTL between new airport housing (9050) and PS3 (31287) BSP.
Year: 2016
Construction of New 132kv DC OHL from New Al-Hayar S/S 8281 up tp BSP S/S #9048 in Riyadh Area.
Year: 2016
132KV OHTL from S/S 9037 to S/S 8612 for Masel Air Defence in Dawadmi.
Year: 2015
Construction of 380kv double circuits overhead transmission lines interconnected to Dharan South, New Dharan Centtral and Duo BSP.
Year: 2015
380KV OHTL to connect the new Shahiliyah BSP 380/115kv with Existing Ghunan S/S.
Year: 2014
Modification of 380Kv Overhead Transmission line NO.08 at SSPP and SS10J (loop in loop out) Yanbu Marafiq.
Year: 2010
380 Kv OHTL – Al Salam Bsp to Mosajyad – Al Madinah – Line length 85.79 Km
Year: 2009
380kv Tabarjal – Al Jouf Project
Year: 2008
Construction of 380kV D/C OHTL from JEC/JRP SS to Abha East 380kV BSP SS
Year 2007
Construction of new 132 kV OHTL at Wadd Al Shamal Wind Ipp
RTV Coating of insulators of OHTL in SOA
Construction of 132 kV OHTL system for Saudi 2000 MW Al Sadawi Solar PV Power Plant
Construction of 132 kV OHTL Al-Ghat Wind IPP Project
Maintenance for 132 kV/380 kv OHTL in Central Operation area
Water & sewage pipelines construction
Construction of water distribution pipelines to replace exisiting pipes connected to Shahhar Water Tank
Supply of 132 kV OHTL material
Maintenance work for 380 kV lines in Western Operation area
Distribution line implementation project to replace old pipes in the Shahar Taif reservoir
Tower foundation REH. & Prot. in WOA
Engineering, Procurement and construction of 132 kV OHTL work
Replacement composite OHTL 380 kV RBG2-JN. Insulator replacement of 380 kV line.
Re-conductoring of 132 kV MISQI-KKUC OHTL in SOA
Rehab & construction of tower foundation COA.
Towers painting and replacement of STEE.
General maintenance for OHTL in WOA. 
General Maintenance for OHTL at AMD- NE. 
Construction of three 132 kV OHTL from SAAD2 Solar PV IPP to SEC SAAD substation
Modification of 380 kV OHTL #8 at SSPP and SS10 (Loop in loop out) – Yanbu
Construction of 380kV D/C OHTL from Jazan Refinery P/P to Muhayil West 380kV BSP Scope: steel tower erection works & conductor stringing our SUB Cont Ref no. ASKEC/M510/PTC/ERE/048
Construction of three 132 kV OHTL from SAAD2 Solar PV IPP to SEC SAAD substation
General inspection, repair, main COA. All electrical maintenance for 132 kV / 380 kV lines in COA
General Maintenance for the overhead COA. Scope: all civil maintenance work for 132 kV 380 kV lines in COA
All the maintenance work for 380 kV lines in WOA
Adjustment of vertical clearance for 132 kV transmission line in SOA
Relocation of unerground cable at Wali Al Ahad road in Tabuk
Rabigh 300MW PV Solar Photovoltaic Independent Power Project – OHTL Portion